Skip to content

Latest commit

 

History

History
76 lines (66 loc) · 3.74 KB

Bathroom.md

File metadata and controls

76 lines (66 loc) · 3.74 KB
title subtitle author email summary header-includes
Remodel Phase 2 (Bathroom)
Richland Prefab 2BR
John D. Fisher
Proposed Phase 2 changes to the Bathroom. Collect plans for Phase 2 to be completed separatetly from the Kitchen, Living Room and Bedrooms.
```{=html} <link rel="stylesheet" type="text/css" media="print" href="print.css" /> ```

Bathroom Phase 2

Bathroom Walls and Floor Phase 2

  • Insulate the floor and walls, as needed, especially exterior wall.
  • Replace window with Cascade white vinyl picture window, with low-E glass and argon gas (tempered and obscure glass).
  • Overlay sheetrock outside shower area, walls and ceiling. Orange peel style texture.

Bathroom Electrical Phase 2

  • Replace exhaust fan with Panasonic Whisper bath fan.
  • Add ceiling light.
  • Retain duplex outlet, adjacent to vanity for hair dryer, curling iron etc.

Bathroom Cabinets and Fixtures Phase 2

  1. Remove old sink and cabinet.
  2. Retain mirror cabinet: GODMORGON Mirror cabinet with 2 doors Article Number: 102.189.99 Size: 23-5/8 x 5-1/2 x 37-3/4 inches.
  3. Retain rack behind toilet.
  4. Retain towel rack near current location.
  5. New sink, already purchased:
    1. Plumber should choose matching shower trim and vanity faucet, matte black preferred, i.e., similar to shower door.
    2. IKEA ÄNGSJÖN / BACKSJÖN Bathroom vanity with sink & faucet Article Number: 995.320.09 Size 25 x 21-1/2 x 28-1/4 inches.
    3. ALMAÅN Leg Article Number: 205.349.16
  6. Retain handheld shower and replace filter. New filter provided by owner.
  7. Toilet: Retain tee-valve and spray hose.