PMBOK 6.5.3.1 p.217
Approved proposed schedule, can only be changed by p04.6 Perform integrated change control
Meta:
- drives Bar charts (gantt charts)
- drives Milestone charts
- drives dd Project schedule network diagram
PMBOK 6.5.3.1 p.217
Approved proposed schedule, can only be changed by p04.6 Perform integrated change control
Meta: