Testing Strategy

This document summarises the software development testing life cycle activities and artefacts for the Telemetry module.

Roles and Responsibilities

Software Testing Life Cycle phases:

Phase When How Result
Requirement analysis Sprint planning, grooming and triaging meetings Brainstorm the feature implementation, design and its implications on the testability. A clarified implementation design with a focus on testability, the acceptance tests criteria are collected, and the testing surface is defined as a part of the story.
Test planning, design and development Development phase during the sprint Implement Unit and Acceptance tests for new functionalities. All functionalities are covered with Unit and Acceptance tests.
Test validation Acceptance phase during the sprint During the code review and iteration review, verify that the Test Suite correctly and completely covers the Acceptance Criteria. The Acceptance Criteria are integrated into the E2E test suite and become a regression suite for future verification.
Test execution A part of the CI process

The roles and responsibilities during the STLC:

Role Responsibilities Performed by
PO Define acceptance criteria for the user stories, assess risks Product Owner
DEV Implement tests for new functionality, extend the test suites, adhere to the test coverage expectations Development team
ARCHITECT Devise system design with a focus on testability Development team
QA Define the testing coverage for each story, ensure the test suite is delivered along with each new piece of functionality. Development team

Testing Levels

Functional Tests

Test Pyramid

Test suite Testing level Purpose
Unit (located along with the individual source files) Unit It tests the individual units of application logic in isolation, focusing on the implementation correctness.
E2E Acceptance Acceptance (high-level) It tests the usability scenarios of Telemetry Manager in a cluster. This test suite assesses the functional correctness of Telemetry Controller.
E2E Operational System It validates the operational aspects of the module (successful module upgrades, deletions, etc.).
E2E integration Integration (high-level) tests the Telemetry Module integration with 3rd party components and modules (with a focus on contract fulfilment).

E2E Test Suites

Testing of New Functionality

Testing a new functionality encompasses two activities: capturing the acceptance criteria for each new functionality and providing the requirements traceability. Requirement and Test Suite are linked by the Behavioural-Driven Testing DSL of the Ginkgo testing framework. User Story and Acceptance Criteria are linked semi-automatically because acceptance criteria are a mandatory part of each user story with new functionality (using the PR-template checklist).

Testing of Existing Functionality

The regression test suite validates the correctness of the product's previously released functionalities using the "retest all" technique. It encompasses the end-to-end and operational test suites.

Non-Functional Tests

Type Automation Frequency Results
Performance tests Semi-automated Automated performance tests are manually triggered when bumping images for Fluent Bit or OTel Collector PR Load Test Github action
Security tests (done SAP-internally) Automated

Source Code Quality

Most of the source code quality prerequisites are checked automatically in the following ways:

  • The code-style requirements are collected and stored as a configuration for the fine-grained static analysis linters.
  • The cognitive and cyclomatic complexity quality gateways are agreed upon and imposed using static analysis linters.
  • Static code checks are implemented using golangci-lint.
  • The Continuous Integration pipeline for each PR controls the violations of static code rules.
  • In the case of a problem, the PR is prevented from moving forward, and all involved parties are notified.
  • This static code validation covers the whole codebase, including the test suites.