You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The levelpath of the outlet(s) of a HUC may terminate outside of the HUC before it reaches the edge of the DEM, resulting in reverse-flow and faulty networks during pit-filling. This is a similar issue to #1280.
Current behavior
The light blue (cyan) levelpath ends just outside of the HUC (black line) and doesn't extend to reach the edge of the WBD-buffered DEM (green line). This causes the DEM-derived reaches (red line) to deviate from the NWM streams, and drops segments (red dashed lines) and catchments (shaded areas) of the DEM-derived reaches where the crosswalk snap distance (100 meters) is exceeded.
Expected behavior
The yellow NWM stream segment should be added to the outlet levelpath.
The text was updated successfully, but these errors were encountered:
mluck
changed the title
[8pt] Levelpath outlets terminate outside of HUC
[8pt] Levelpath outlets terminate outside of HUC before reaching WBD buffer
Sep 19, 2024
The levelpath of the outlet(s) of a HUC may terminate outside of the HUC before it reaches the edge of the DEM, resulting in reverse-flow and faulty networks during pit-filling. This is a similar issue to #1280.
Current behavior
The light blue (cyan) levelpath ends just outside of the HUC (black line) and doesn't extend to reach the edge of the WBD-buffered DEM (green line). This causes the DEM-derived reaches (red line) to deviate from the NWM streams, and drops segments (red dashed lines) and catchments (shaded areas) of the DEM-derived reaches where the crosswalk snap distance (100 meters) is exceeded.
Expected behavior
The yellow NWM stream segment should be added to the outlet levelpath.
The text was updated successfully, but these errors were encountered: