Skip to content

Latest commit

 

History

History
106 lines (86 loc) · 8.07 KB

20200119_Brown_islands.md

File metadata and controls

106 lines (86 loc) · 8.07 KB

Review Meeting - 2020/01/20@11am

Agenda

Issue Title Presenter Status Duration Time
#505
#12
Large Models/Results Rendering & Interaction (M9; D4.a)
Postpro workbench; S-D15, Y3M6
MaG In progress 5min
#68
#21
Everybody at z43 uses osparc for python/matlab scripting
Simple creation of data-processing modules, S-D7, Y3M2,4,5,2-12
PC In progress 5min
#93 Move Dalco Cluster to Z43 ALL MaG In progress 3min
#18 Macro/templates, towards guided mode, S-D10, Y3M4 OM In progress 5min
#5 AWS, S-D22, Y3M5,1-12 ALL In progress 5min
#54 Platform Resource Management SAN In progress 10min
#6 DevOps ALL SAN In progress 5min
#1204 UI Improvements IP OM In progress 10min

Progress

Deliverable Due Title % Done Notes
J-D3 M1 Retreat prep 100 Retreat has taken place
J-D15 M1 Documentation agreement 75 Requirements established
S-D26 M1 Idea Lab subaward 100 The subaward has been setup and preparations are ongoing
S-D2 M2 OpenCOR / CellML module & PMR S-D2, M2 #1069 75 First version implemented, will be revisited as part of the simplified creation of data analysis services task
J-D33 M2 Publication linking, J-D33, Y3M2,8 #33 100 Meta-data sections throughout SIM-CORE support linking to pdf, webpages; awaiting MAP-CORE functionality to automatically surface publications (based on DOI?)
J-D3 M2 Retreat 100
J-D6.a M2 Conference list 50
J-D21 M2 DRC feedback/issue collection and tracking (Infrastructure) - J-D21 #1065 100
J-D28.a M2 Portal testing (Testing and Infrastructure) - J-D28 #1066 oSPARC end-to-end testing infrastructure established
J-D7.a M2 simple creation of data-processing modules, S-D7, Y3M2,4,5,2-12 #21 100 survey drafted, work on functionality started
S-D24 M2 UI/UX subaward 100 first phase contracted, ongoing
S-D7 data analysis and visualization 25 survey has been drafted
S-D3g metrics 75 metrics have been selected and prepared for presentation to steering committee
S-D18 M3 NEUROFAUNA rat 75
J-D3e M3 DRC Governance strategies 100
J-D4 M3 slide-decks (marketing material) 80
J-D20 M3 White paper outlining SPARC data standards and QC metrics for SPARC data depositors
J-D29 M3 Data access/cost structure
S-D10 M4 macro/templates, towards guided mode
S-D22 M5 AWS
[S-D16] M5 o2S2PARC API

Blockers

  • S-D18: decaying rat prevents reimaging required to properly segment the PNS; registration-based approach will be tried, to merge PNS images from previously scanned rat
  • S-D9: Gazelle requires support in scheduling their meetings and calls with focus groups, stake owners, etc.