You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The modeler may want to specify capacity addition in a future year (e.g. if they know a power plant is going to be built in the future). This can be done through the ExistingCapacity.csv file, however anything put in this file will only be registered if there is nonzero capacity in the starting year. If this isn't the case, the asset won't be registered and any additional capacity put in future years won't be applied.
I think maybe a current workaround is to put a small capacity in the starting year (e.g. 0.1), (although I'm not sure whether that actually works), but it would be good to get this working without having to do that
The text was updated successfully, but these errors were encountered:
The modeler may want to specify capacity addition in a future year (e.g. if they know a power plant is going to be built in the future). This can be done through the
ExistingCapacity.csv
file, however anything put in this file will only be registered if there is nonzero capacity in the starting year. If this isn't the case, the asset won't be registered and any additional capacity put in future years won't be applied.I think maybe a current workaround is to put a small capacity in the starting year (e.g. 0.1), (although I'm not sure whether that actually works), but it would be good to get this working without having to do that
The text was updated successfully, but these errors were encountered: