You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
It may seem like we've only just closed an issue about PAT testing (and we did, it was #1529), but lots of the items on the PAT test register were last tested in 2021, so we should test them again. Another pass round the space will also catch any newly-arrived items which have slipped through without getting tested.
Events Room
Kitchen
Main Room
Vinyl cutting and heatpress area
CNC room
Laser-cutter room
Fibre arts room
Dinky
Network closet
Snug
Room29
The text was updated successfully, but these errors were encountered:
Made a start on this today, and tested the heatpresses and most of the rest of the stuff on the same worktop. Need to test the printer and the extension nearest to it (which we need to pull out cupboards to get access to), and also the extensions for the bookcase-of-things.
We're getting chased for an updated PAT report from the landlord, so need to get this moving again.
It'd be nice if it wasn't pretty much all left to me to do this time round. Digging out the things that need to be tested and putting them back afterwards takes probably as much time as doing the testing itself (maybe more), and that doesn't require any PAT training 😀
I wonder if it would work to combine it with things like the proposed reorganising of the CNC room #1949, as that will involve lots of similar moving/tidying of equipment?
I’m happy to help with this, I’m a bit restricted with times but weekday
evenings are better for me. I don’t mind doing the PAT test training or
moving stuff.
On Tue, 1 Oct 2024 at 03:40, Adrian McEwen ***@***.***> wrote:
We're getting chased for an updated PAT report from the landlord, so need
to get this moving again.
It'd be nice if it wasn't pretty much all left to me to do this time
round. Digging out the things that need to be tested and putting them back
afterwards takes probably as much time as doing the testing itself (maybe
more), and that doesn't require any PAT training 😀
I wonder if it would work to combine it with things like the proposed
reorganising of the CNC room #1949
<#1949>, as that
will involve lots of similar moving/tidying of equipment?
—
Reply to this email directly, view it on GitHub
<#1860 (comment)>,
or unsubscribe
<https://github.com/notifications/unsubscribe-auth/ACCA5M4UR4SXQCXJDQUCGU3ZZIDTJAVCNFSM6AAAAABPES4RFWVHI2DSMVQWIX3LMV43OSLTON2WKQ3PNVWWK3TUHMZDGOBUGY3DMOBWGU>
.
You are receiving this because you are subscribed to this thread.Message
ID: ***@***.***>
It may seem like we've only just closed an issue about PAT testing (and we did, it was #1529), but lots of the items on the PAT test register were last tested in 2021, so we should test them again. Another pass round the space will also catch any newly-arrived items which have slipped through without getting tested.